Engineering starts with defined inputs.

Use an agreed technical basis to connect requirements, equipment configuration and documentation.

Requirements review

  • Clarify the medium and process objective.
  • Record operating and design conditions separately.
  • Identify site interfaces, available utilities and maintenance requirements.

Configuration review

Discuss the proposed equipment arrangement and the assumptions behind it. Identify open conditions and approval responsibilities before accepting a specification.

Drawing and document review

Agree on drawing deliverables, connection information, inspection documents and operating information. Product-specific CAD and 3D models are supplied only when available and approved for sharing.

Define the system boundary →

Every process starts
with the right questions.

Tell us what flows in, what needs to change, and what the equipment must deliver.

Discuss your equipment