Engineering starts with defined inputs.
Use an agreed technical basis to connect requirements, equipment configuration and documentation.
Requirements review
- Clarify the medium and process objective.
- Record operating and design conditions separately.
- Identify site interfaces, available utilities and maintenance requirements.
Configuration review
Discuss the proposed equipment arrangement and the assumptions behind it. Identify open conditions and approval responsibilities before accepting a specification.
Drawing and document review
Agree on drawing deliverables, connection information, inspection documents and operating information. Product-specific CAD and 3D models are supplied only when available and approved for sharing.
Every process starts
with the right questions.
Tell us what flows in, what needs to change, and what the equipment must deliver.