How to define an integrated equipment supply scope

Make the equipment list, site interfaces and exclusions explicit before comparing quotations.

Information to collect

Information What to provide
Included equipment Name every major item and the required function.
Mechanical boundary Identify piping, supports, insulation, valves and installation interfaces.
Controls State whether instruments, panels, software and electrical work are requested.
Site activities List installation supervision, commissioning and training separately.
Acceptance Define drawing review, inspection points and the required documentation.

Keep unknown values open

State units, distinguish required values from existing operating data, and mark undecided items clearly. Ask the engineering team to identify any missing inputs before assuming that a proposal meets the intended duty.

Use the brief in a technical discussion

This checklist helps organise an enquiry. It does not establish a final design or certify equipment suitability.

Explore related equipment or send a technical enquiry.

Every process starts
with the right questions.

Tell us what flows in, what needs to change, and what the equipment must deliver.

Discuss your equipment